This November project occurred in 2017 and gave us the unique opportunity to renovate a pre-existing Bathroom room for our client. The first design had a shower unit with the original sink for the homeowners to clean specific items in their leisure time. We thought it would be a good idea to completely start over with this area by taking out the cement slab, tearing down the installed utilities and drain the water that was left over in the plumbing system.
From here we began to place new concrete on the floor and contact our contractors to initiate the tiling.
This was also rewarding for us as we were able to use in-house designs that were in line with the client’s vision of the space. We were also able to install high-end cabinetry at an affordable price for the client, as she wanted an interior that reflected style and luxury.